Modeled estimate · Bipedal humanoids

Approximately 47,875 Humanoids built worldwide

Scenario range 31.4k–79.0k/Inspect assumptions

Modeled production+1 / 11m 40s
Estimated daily output123.4/day
Next modeled unit in7:25
Next milestone 50.0k · ~18 days

General-purpose bipeds, including research and internal fleets. The clock follows a production model; it is not live factory telemetry.

Explore growth ↓
Download & cite

Draft model · Reviewed 2026-09-05

2020 → 2030 / Production, over time

The rise of humanoids.

From research fleets to a possible manufacturing scale-up. Explore reconstructed history and the range of paths to 2030.

Compare shipment reports ↗
Linear scale

Current estimate · Sep 5, 2026

≈47,875

Cumulative humanoids built

Assumption scenarios

31.4k–79.0k

Not statistical confidence limits

2026 estimated output

≈45,307/ year

27.8k–77.6k · includes forecast

Cumulative bipedal humanoid production, 2020 through 2030White is reconstructed historical production. Blue dashes show forecast periods from July 2026 onward. Grey points are a partial reported sample, not global totals. Use the date slider to read values and evidence.02.5M5M7.5M10Mhigh 9.37Mcentral 1.29Mlow 163.0kJan 1, 2020: 8+ reported sample. Boston Dynamics / Atlas: Seven pre-2020 DARPA Atlas platforms. Legacy research programs: ASIMO existence before 2020; a sample, not a fleet census.Jan 6, 2020: 10+ reported sample. Agility Robotics: Ford's two Digits, documented twice but counted once.Jan 1, 2024: 19+ reported sample. Unitree: 2023 production, disclosed March 2026.Jan 1, 2025: 564+ reported sample. Unitree: 9 + 545 produced in disjoint years; disclosed March 2026.Dec 8, 2025: 2,410+ reported sample. AGIBOT: X-series biped sample; mixed portfolio excluded.Jan 1, 2026: 8,910+ reported sample. Unitree: Earlier 554 builds + >6,500 produced during 2025.Apr 29, 2026: 9,260+ reported sample. Figure: Completed Figure 03 cohort; older models not added to sample.Jul 1, 2026: 14,706+ reported sample. Unitree: Replace production floor with disjoint 2025/H1 2026 deliveries: >5,500 + >7,000. Never add these deliveries to potentially overlapping production/inventory.NOW202020222024202620282030

The early years, magnified

2020–2026 · independent linear scale

Same model, closer view. Select a date here or use the shared date slider. The dashed section includes modeled production since July 2026.

Magnified historical production from 2020 to the current model timeThis panel has its own labeled vertical scale. White is reconstructed history, blue dashes are modeled production from July 2026. Grey points show a partial reported sample. The date slider below provides keyboard access to the same values.040K80K2020-01-01T00:00:00.000Z: 8+ partial reported sample2020-01-06T00:00:00Z: 10+ partial reported sample2024-01-01T00:00:00.000Z: 19+ partial reported sample2025-01-01T00:00:00.000Z: 564+ partial reported sample2025-12-08T00:00:00Z: 2410+ partial reported sample2026-01-01T00:00:00.000Z: 8910+ partial reported sample2026-04-29T00:00:00Z: 9260+ partial reported sample2026-07-01T00:00:00.000Z: 14706+ partial reported sample2020202120222023202420252026
—Reconstructed history┄ForecastShaded: assumption scenarios

2026 evidence & assumptions · 14,706+ dated sample minimum

Quarterly production follows the manufacturer's baseline, ramp delay, growth and execution/demand assumptions. Company ambitions remain separate. The reported sample is partial and may be disclosed retrospectively.

Unitree · ≈17,881 built in 2026

Includes forecast assumptions · 2023/2024 use reported production. 2025 uses the >6,500 company floor with inventory uncertainty. H1 2026 converts >7,000 shipments to 7,000/8,200/11,200 built; no repeated addition of shipments.

AGIBOT · ≈14,761 built in 2026

Includes forecast assumptions · Mixed milestones are never summed. 2024 biped share is uncertain. Central June 2026 cumulative biped estimate uses the earlier 71.76% family-share proxy; A2-W makes this an assumption, not a measured biped share.

UBTECH · ≈2,545 built in 2026

Includes forecast assumptions · Early Walker cohorts are editorial allocations, not measured totals. Later periods use shipment/sales proxies with biped-share and inventory uncertainty; toy and wheeled lines are excluded.

Leju Robotics · ≈1,744 built in 2026

Includes forecast assumptions · Kuavo-scale platforms only. Dedicated small education products are excluded. Earlier zeros are scope allocations; later figures use shipment proxies plus modeled inventory.

Figure · ≈1,411 built in 2026

Includes forecast assumptions · Prototype and older-generation cohorts are reconstructed. H1 2026 includes the >350 Figure 03 milestone and uncertain subsequent builds; a demonstrated hourly cycle does not establish 24/7 output.

EngineAI · ≈1,328 built in 2026

Includes forecast assumptions · General-purpose bipeds only. Shipment estimates are proxies; 2024 and H1 2026 allowances are explicitly modeled.

Fourier · ≈872 built in 2026

Includes forecast assumptions · GR-series bipeds only; rehabilitation devices excluded. Early cohorts and inventory are weakly evidenced reconstruction allowances.

Agility Robotics · ≈371 built in 2026

Includes forecast assumptions · Only complete Digits enter this row; leg-only Cassie robots excluded. Ford's two deliveries are one observation. Remaining early production is an uncertain research/pilot allowance.

Tesla · ≈604 built in 2026

Includes forecast assumptions · Actual internal fleet totals are not public. These are wide editorial prototype/pilot scenarios, not a claim that management's targets were achieved or missed.

Boston Dynamics / Atlas · ≈60 built in 2026

Includes forecast assumptions · Hydraulic and electric Atlas are distinct physical cohorts. Seven DARPA platforms form an old sample floor; later prototype and product cohorts are assumptions.

Legacy research programs · ≈183 built in 2026

Includes forecast assumptions · Disjoint legacy/research allowance for Honda, PAL, HUBO, HRP and comparable institutional bipeds, excluding every named maker. Program evidence supports existence, not these quantities. All quantities are editorial scenarios.

Other manufacturers · ≈3,541 built in 2026

Includes forecast assumptions · Disjoint emerging-maker cohort: Apptronik, 1X bipeds, newer Chinese, European, Indian and other programs. Excludes the named makers and legacy research row. EVE and other wheeled products are excluded. Missing coverage is modeled, never an invented reported total.

Early years depend on an estimated pre-2020 opening balance and incomplete research-fleet disclosures. Use History to inspect the smaller numbers. Forecasts through the end of 2030 are assumption scenarios, not guaranteed bounds. Capacity, shipments and company targets remain separately labeled.

The 2030 outlook / Draft

What drives the 2030 forecast?

≈1.29M

Cumulative built by Dec 31, 2030 · central scenario

The central scenario reaches approximately 1.29M cumulatively built, with 658.4k produced during 2030. The 163.0k–9.37M range reflects radically different execution and demand assumptions. It is not a probability interval.

  1. AGIBOT ↗

    ≈386.2k

    Cumulative built by 2030 · central. Growth 2×/year; ramp delay 0 quarters.

  2. Unitree ↗

    ≈380.7k

    Cumulative built by 2030 · central. Growth 1.8×/year; ramp delay 0 quarters.

  3. Tesla ↗

    ≈165.0k

    Cumulative built by 2030 · central. Growth 4.5×/year; ramp delay 2 quarters.

The largest contributions set the scale of this outlook. Ramp delays, annual growth and the combined capacity, utilization, yield, components and demand ceiling drive the differences between scenarios.

Annual output & cumulative totals
Annual output and cumulative production, central scenario
YearBuilt that yearCumulative built
2026≈45,307≈64,315
2027≈80,525≈144,840
2028≈159,119≈303,959
2029≈324,233≈628,192
2030≈658,426≈1,286,617
Manufacturer contributions & ramp assumptions

Quarterly output grows from each manufacturer's H1 2026 modeled daily baseline after a disclosed ramp delay. It is capped by nominal 2030 production potential × utilization × yield × component availability × demand share. All factors below are assumptions; capacity is not reported current output. Existing baseline output continues during the delay.

AGIBOT≈386.2k · 30.0%
Annual growth
2×
Ramp delay
0 quarters
2030 nominal potential
350.0k/year
Utilization
70%
Yield
95%
Components
90%
Demand realization
85%

All growth, delays, capacity paths, utilization, yield, component and demand factors are explicit editorial assumptions, informed by the linked disclosures. Capacity2030 is a scenario ceiling, not installed capacity. During ramp delays, baseline output remains subject to the same execution and demand ceiling. The eligible holdout selected constant-growth; its implied annual growth is capped at 2× in the central long-term case. The cap is editorial, not fitted to the holdout.

Model assumptions reviewed 2026-09-05 · source dates below identify the underlying disclosures.

Unitree≈380.7k · 29.6%
Annual growth
1.8×
Ramp delay
0 quarters
2030 nominal potential
400.0k/year
Utilization
70%
Yield
95%
Components
90%
Demand realization
85%

All growth, delays, capacity paths, utilization, yield, component and demand factors are explicit editorial assumptions, informed by the linked disclosures. Capacity2030 is a scenario ceiling, not installed capacity. During ramp delays, baseline output remains subject to the same execution and demand ceiling.

Model assumptions reviewed 2026-09-05 · source dates below identify the underlying disclosures.

Tesla≈165.0k · 12.8%
Annual growth
4.5×
Ramp delay
2 quarters
2030 nominal potential
1.00M/year
Utilization
70%
Yield
95%
Components
90%
Demand realization
85%

All growth, delays, capacity paths, utilization, yield, component and demand factors are explicit editorial assumptions, informed by the linked disclosures. Capacity2030 is a scenario ceiling, not installed capacity. During ramp delays, baseline output remains subject to the same execution and demand ceiling.

Model assumptions reviewed 2026-09-05 · source dates below identify the underlying disclosures.

Other manufacturers≈104.6k · 8.1%
Annual growth
2×
Ramp delay
0 quarters
2030 nominal potential
150.0k/year
Utilization
70%
Yield
95%
Components
90%
Demand realization
85%

All growth, delays, capacity paths, utilization, yield, component and demand factors are explicit editorial assumptions, informed by the linked disclosures. Capacity2030 is a scenario ceiling, not installed capacity. During ramp delays, baseline output remains subject to the same execution and demand ceiling.

Model assumptions reviewed 2026-09-05 · source dates below identify the underlying disclosures.

UBTECH≈75.1k · 5.8%
Annual growth
2×
Ramp delay
0 quarters
2030 nominal potential
100.0k/year
Utilization
70%
Yield
95%
Components
90%
Demand realization
85%

All growth, delays, capacity paths, utilization, yield, component and demand factors are explicit editorial assumptions, informed by the linked disclosures. Capacity2030 is a scenario ceiling, not installed capacity. During ramp delays, baseline output remains subject to the same execution and demand ceiling.

Model assumptions reviewed 2026-09-05 · source dates below identify the underlying disclosures.

Figure≈60.3k · 4.7%
Annual growth
2.5×
Ramp delay
2 quarters
2030 nominal potential
100.0k/year
Utilization
70%
Yield
95%
Components
90%
Demand realization
85%

All growth, delays, capacity paths, utilization, yield, component and demand factors are explicit editorial assumptions, informed by the linked disclosures. Capacity2030 is a scenario ceiling, not installed capacity. During ramp delays, baseline output remains subject to the same execution and demand ceiling.

Model assumptions reviewed 2026-09-05 · source dates below identify the underlying disclosures.

EngineAI≈38.9k · 3.0%
Annual growth
2×
Ramp delay
0 quarters
2030 nominal potential
75.0k/year
Utilization
70%
Yield
95%
Components
90%
Demand realization
85%

All growth, delays, capacity paths, utilization, yield, component and demand factors are explicit editorial assumptions, informed by the linked disclosures. Capacity2030 is a scenario ceiling, not installed capacity. During ramp delays, baseline output remains subject to the same execution and demand ceiling.

Model assumptions reviewed 2026-09-05 · source dates below identify the underlying disclosures.

Leju Robotics≈37.5k · 2.9%
Annual growth
1.8×
Ramp delay
0 quarters
2030 nominal potential
50.0k/year
Utilization
70%
Yield
95%
Components
90%
Demand realization
85%

All growth, delays, capacity paths, utilization, yield, component and demand factors are explicit editorial assumptions, informed by the linked disclosures. Capacity2030 is a scenario ceiling, not installed capacity. During ramp delays, baseline output remains subject to the same execution and demand ceiling.

Model assumptions reviewed 2026-09-05 · source dates below identify the underlying disclosures.

Fourier≈19.0k · 1.5%
Annual growth
1.8×
Ramp delay
0 quarters
2030 nominal potential
50.0k/year
Utilization
70%
Yield
95%
Components
90%
Demand realization
85%

All growth, delays, capacity paths, utilization, yield, component and demand factors are explicit editorial assumptions, informed by the linked disclosures. Capacity2030 is a scenario ceiling, not installed capacity. During ramp delays, baseline output remains subject to the same execution and demand ceiling.

Model assumptions reviewed 2026-09-05 · source dates below identify the underlying disclosures.

Agility Robotics≈10.1k · 0.8%
Annual growth
2×
Ramp delay
1 quarters
2030 nominal potential
30.0k/year
Utilization
70%
Yield
95%
Components
90%
Demand realization
85%

All growth, delays, capacity paths, utilization, yield, component and demand factors are explicit editorial assumptions, informed by the linked disclosures. Capacity2030 is a scenario ceiling, not installed capacity. During ramp delays, baseline output remains subject to the same execution and demand ceiling.

Model assumptions reviewed 2026-09-05 · source dates below identify the underlying disclosures.

Boston Dynamics / Atlas≈7.3k · 0.6%
Annual growth
3.5×
Ramp delay
2 quarters
2030 nominal potential
30.0k/year
Utilization
70%
Yield
95%
Components
90%
Demand realization
85%

All growth, delays, capacity paths, utilization, yield, component and demand factors are explicit editorial assumptions, informed by the linked disclosures. Capacity2030 is a scenario ceiling, not installed capacity. During ramp delays, baseline output remains subject to the same execution and demand ceiling.

Model assumptions reviewed 2026-09-05 · source dates below identify the underlying disclosures.

Legacy research programs≈2.1k · 0.2%
Annual growth
1.1×
Ramp delay
0 quarters
2030 nominal potential
3.0k/year
Utilization
70%
Yield
95%
Components
90%
Demand realization
85%

All growth, delays, capacity paths, utilization, yield, component and demand factors are explicit editorial assumptions, informed by the linked disclosures. Capacity2030 is a scenario ceiling, not installed capacity. During ramp delays, baseline output remains subject to the same execution and demand ceiling.

Model assumptions reviewed 2026-09-05 · source dates below identify the underlying disclosures.

Company ambitions, including Tesla / Elon Musk

Annual output, capacity and supply-chain plans describe different quantities. They are not added to the cumulative estimate. A missing outcome is marked unverified, not automatically missed.

Tesla / Elon Musk

10,000 · annual output

Initial 2025 internal plan: roughly 10,000

Announced 2025-01-29 · horizon 2025-12-31 · revised · reviewed 2026-09-05

Musk qualified this as ambitious. March remarks focused on 5,000, with 10,000 as an upper ambition. No comparable actual full-year total has been established.

Our central 2025 reconstruction: ≈200 produced that year. This is modeled, not a disclosed outcome.

Tesla / Elon Musk

5,000 · annual output

March 2025 ambition: 5,000, with 10,000 at the upper end

Announced 2025-03-20 · horizon 2025-12-31 · unverified · reviewed 2026-09-05

No comparable company-reported 2025 total was found. July 2026 describes successor lines under construction; that does not quantify 2025 pilot output. Not scored as achieved or missed.

Our central 2025 reconstruction: ≈200 produced that year. This is modeled, not a disclosed outcome.

Tesla / Elon Musk

50,000 · annual output

2026 production ambition

Announced 2025-03-20 · horizon 2026-12-31 · future · reviewed 2026-09-05

Year still in progress; July 2026 filing describes line installation. Central model includes slower ramping and broad uncertainty.

Our central 2026 scenario: ≈604 produced that year. This is modeled, not a disclosed outcome.

Tesla / Elon Musk

1,000,000 · annual output

One million Optimus per year by 2030, potentially 2029

Announced 2025-04-22 · horizon 2030-12-31 · future · reviewed 2026-09-05

Management ambition, not a cumulative fleet estimate or a guaranteed production rate. The model uses explicit execution and demand assumptions.

Our central 2030 scenario: ≈127,949 produced that year. This is modeled, not a disclosed outcome.

Figure

12,000 · capacity

BotQ annual line design capacity

Announced 2025-03-15 · horizon not dated · future · reviewed 2026-09-05

Disclosure does not give a firm date for full utilization. April 2026 separately reports >350 builds; line capability is not completed production.

Figure

100,000 · supply chain capability

Supply chain able to scale to 100,000 robots over four years

Announced 2025-03-15 · horizon 2029-03-15 · future · reviewed 2026-09-05

Not 100,000 robots already built, orders, or an unconditional production commitment.

Hyundai / Boston Dynamics

30,000 · capacity

Scalable system capable of 30,000 robots annually by 2028

Announced 2026-01-05 · horizon 2028-12-31 · future · reviewed 2026-09-05

Future robot-production system target; actual Atlas mix, commissioning, utilization and demand remain uncertain.

How well did the model predict known outcomes?

1 eligible holdout · mixed-form production · global accuracy not established

Only one eligible, mixed-form holdout has three earlier comparable dated milestones. It cannot validate a global biped forecast through 2030. Unitree's 2023/2024 production was published in 2026 and cannot be used to pretend a 2024 backtest was possible. Lower-bound shipment reports are not exact production outcomes.

AGIBOT holdout: forecast on 2026-03-30 → observed 2026-06-28. Actual cumulative mixed-form production: 15,000. Best short-horizon candidate: constant growth.

One eligible mixed-form holdout; not global forecast accuracy
MethodPredictionAbsolute error
constant output14,018982
constant growth15,290290
damped ramp14,597403

Only sources published by the cutoff enter the inputs. Constant growth uses the change between the two preceding interval rates; the ramp comparator halves that log-growth rate. The preferred family informs AGIBOT's short-term direction. Long-term growth is capped at an explicitly assumed 2× annually and constrained by execution/demand ceilings. None of these results validates a 2030 global prediction.

Industry database

The public manufacturing record

Documented factories
99
Organizations & partnerships
86
Robot models
101
Countries represented
24

Where are humanoids being built?

Explore the documented factories powering the humanoid robotics industry, from active production lines to formally announced projects.

Explore global factory map
99 documented humanoid manufacturing facilities plotted on a dark world map
99 documented sitesNatural Earth

Editorial ledger

Latest verified changes

Open the update ledger
  1. 01

    Biped inclusion review: 99 qualifying facilities

    The registry retains 100 dossiers. Noetix Dongguan is excluded from qualifying counts and exports because the available sources do not establish complete biped manufacturing at this site. Historical audit milestones remain dated records.

  2. 02

    Tesla Fremont classified as ramping

    The Fremont Optimus record now distinguishes reported initial production from Tesla's future one-million-unit design target.

  3. 03

    Global factory audit reaches 100 documented sites

    A country-by-country verification pass expanded the map while retaining source, confidence, and public-location requirements.

Open the calculationHow this number is calculated

Cumulative complete general-purpose bipedal humanoids built worldwide, including research prototypes and internal fleets. G1/X-series-scale robots qualify; small dedicated educational/toy humanoids do not.

Opening balance · before 2020

≈598

Modeled average production

+123.4 / day

Reported sample minimum

14,706+

Current estimate = pre-2020 opening balance + production accumulated across dated historical and forecast periods. The reported sample minimum comes from non-overlapping manufacturer groups and dated production/delivery disclosures. It is a partial historical floor, not a live global census.

At review on 2026-09-05, the central estimate was 47,875: 14,706 in the reported sample floor and approximately 33,169 in modeled history, inventory, missing coverage and subsequent production.

Low and high are explicit assumption scenarios, not statistical confidence limits or guaranteed bounds. Production can fall outside this range. One shared UTC model integrates each dated production segment. Forecast rates vary by quarter and stop at the end of 2030; this is not live factory telemetry. Historical within-period timing is interpolated, not a record of individual factory events.

Research coverage & gaps
  • 2020–2025 global points are reconstructions, not discovered global censuses. Early years depend heavily on the disclosed opening balance and research-program allowances.
  • Chinese production filings corrected Unitree's early history. Japanese Honda and Korean KAIST sources establish programs, not annual quantities. Geographic coverage is not a claim of exhaustive manufacturer coverage.
  • Quarterly forecasts begin July 2026 after the last common half-year cutoff. The current date lies inside that modelled period. All 2030 inputs are scenario assumptions; company targets are presented separately.
  • Retrospective historical reconstruction may use later publications. Historical backtests use publication dates strictly, preventing that same information from leaking into a past forecast.
  • The one comparable holdout is mixed-form AGIBOT output. Its preferred extrapolator is not a validated global bipedal forecasting model; no accuracy percentage is promised for 2030.

The manufacturer ledger

At review · 2026-09-05

Open any row for the arithmetic, assumptions and original sources. All company totals below are modeled.

ManufacturerBuilt estimatePer day
Unitree≈18,77248.8

H/G/R bipedal platforms; wheeled and quadruped products excluded.

Opening balance: Pre-2020 opening balance is an explicit research-fleet scenario. It is retained cumulatively; retirement does not undo production.

Historical reconstruction: 2023/2024 use reported production. 2025 uses the >6,500 company floor with inventory uncertainty. H1 2026 converts >7,000 shipments to 7,000/8,200/11,200 built; no repeated addition of shipments.

Opening scenarios: 0 / 0 / 0. H1 2026 baseline daily rate scenarios: 36.3 / 48.8 / 69.7.

Reported sample: 12,500+. A disjoint reported sample at the latest historical cutoff; consult dated observations. Unknown does not mean zero.

  • 2023/2024 use reported production. 2025 uses the >6,500 company floor with inventory uncertainty. H1 2026 converts >7,000 shipments to 7,000/8,200/11,200 built; no repeated addition of shipments.
  • All growth, delays, capacity paths, utilization, yield, component and demand factors are explicit editorial assumptions, informed by the linked disclosures. Capacity2030 is a scenario ceiling, not installed capacity. During ramp delays, baseline output remains subject to the same execution and demand ceiling.
  • Historical output is spread uniformly within each dated period solely for interpolation. Digit 2020 is split at the dated Ford delivery to respect that observed minimum. Forecast output is constant inside each quarter; it changes at quarter boundaries.
AGIBOT≈13,52540.2

Bipedal A/X products only; modeled exclusion of G-series and A2-W.

Opening balance: Pre-2020 opening balance is an explicit research-fleet scenario. It is retained cumulatively; retirement does not undo production.

Historical reconstruction: Mixed milestones are never summed. 2024 biped share is uncertain. Central June 2026 cumulative biped estimate uses the earlier 71.76% family-share proxy; A2-W makes this an assumption, not a measured biped share.

Opening scenarios: 0 / 0 / 0. H1 2026 baseline daily rate scenarios: 22.1 / 40.2 / 57.8.

Reported sample: 1,846+. A disjoint reported sample at the latest historical cutoff; consult dated observations. Unknown does not mean zero.

  • Mixed milestones are never summed. 2024 biped share is uncertain. Central June 2026 cumulative biped estimate uses the earlier 71.76% family-share proxy; A2-W makes this an assumption, not a measured biped share.
  • All growth, delays, capacity paths, utilization, yield, component and demand factors are explicit editorial assumptions, informed by the linked disclosures. Capacity2030 is a scenario ceiling, not installed capacity. During ramp delays, baseline output remains subject to the same execution and demand ceiling. The eligible holdout selected constant-growth; its implied annual growth is capped at 2× in the central long-term case. The cap is editorial, not fitted to the holdout.
  • Historical output is spread uniformly within each dated period solely for interpolation. Digit 2020 is split at the dated Ford delivery to respect that observed minimum. Forecast output is constant inside each quarter; it changes at quarter boundaries.
UBTECH≈3,1136.9

General-purpose Walker/industrial bipeds; company totals require a form-factor adjustment.

Opening balance: Pre-2020 opening balance is an explicit research-fleet scenario. It is retained cumulatively; retirement does not undo production.

Historical reconstruction: Early Walker cohorts are editorial allocations, not measured totals. Later periods use shipment/sales proxies with biped-share and inventory uncertainty; toy and wheeled lines are excluded.

Opening scenarios: 1 / 20 / 80. H1 2026 baseline daily rate scenarios: 4.4 / 6.9 / 10.8.

Reported sample: Not established. A disjoint reported sample at the latest historical cutoff; consult dated observations. Unknown does not mean zero.

  • Early Walker cohorts are editorial allocations, not measured totals. Later periods use shipment/sales proxies with biped-share and inventory uncertainty; toy and wheeled lines are excluded.
  • All growth, delays, capacity paths, utilization, yield, component and demand factors are explicit editorial assumptions, informed by the linked disclosures. Capacity2030 is a scenario ceiling, not installed capacity. During ramp delays, baseline output remains subject to the same execution and demand ceiling.
  • Historical output is spread uniformly within each dated period solely for interpolation. Digit 2020 is split at the dated Ford delivery to respect that observed minimum. Forecast output is constant inside each quarter; it changes at quarter boundaries.
Leju Robotics≈1,8834.8

General-purpose Kuavo bipeds; wheeled and small educational products excluded.

Opening balance: Pre-2020 opening balance is an explicit research-fleet scenario. It is retained cumulatively; retirement does not undo production.

Historical reconstruction: Kuavo-scale platforms only. Dedicated small education products are excluded. Earlier zeros are scope allocations; later figures use shipment proxies plus modeled inventory.

Opening scenarios: 0 / 0 / 0. H1 2026 baseline daily rate scenarios: 3.6 / 4.8 / 6.8.

Reported sample: Not established. A disjoint reported sample at the latest historical cutoff; consult dated observations. Unknown does not mean zero.

  • Kuavo-scale platforms only. Dedicated small education products are excluded. Earlier zeros are scope allocations; later figures use shipment proxies plus modeled inventory.
  • All growth, delays, capacity paths, utilization, yield, component and demand factors are explicit editorial assumptions, informed by the linked disclosures. Capacity2030 is a scenario ceiling, not installed capacity. During ramp delays, baseline output remains subject to the same execution and demand ceiling.
  • Historical output is spread uniformly within each dated period solely for interpolation. Digit 2020 is split at the dated Ford delivery to respect that observed minimum. Forecast output is constant inside each quarter; it changes at quarter boundaries.
Figure≈1,1673.9

Figure 01/02/03, including internal research fleets.

Opening balance: Pre-2020 opening balance is an explicit research-fleet scenario. It is retained cumulatively; retirement does not undo production.

Historical reconstruction: Prototype and older-generation cohorts are reconstructed. H1 2026 includes the >350 Figure 03 milestone and uncertain subsequent builds; a demonstrated hourly cycle does not establish 24/7 output.

Opening scenarios: 0 / 0 / 0. H1 2026 baseline daily rate scenarios: 2.5 / 3.9 / 8.5.

Reported sample: 350+. A disjoint reported sample at the latest historical cutoff; consult dated observations. Unknown does not mean zero.

  • Prototype and older-generation cohorts are reconstructed. H1 2026 includes the >350 Figure 03 milestone and uncertain subsequent builds; a demonstrated hourly cycle does not establish 24/7 output.
  • All growth, delays, capacity paths, utilization, yield, component and demand factors are explicit editorial assumptions, informed by the linked disclosures. Capacity2030 is a scenario ceiling, not installed capacity. During ramp delays, baseline output remains subject to the same execution and demand ceiling.
  • Historical output is spread uniformly within each dated period solely for interpolation. Digit 2020 is split at the dated Ford delivery to respect that observed minimum. Forecast output is constant inside each quarter; it changes at quarter boundaries.
EngineAI≈1,3383.6

General-purpose PM01/SE01/T800 bipeds; stationary lower-body-free platforms excluded.

Opening balance: Pre-2020 opening balance is an explicit research-fleet scenario. It is retained cumulatively; retirement does not undo production.

Historical reconstruction: General-purpose bipeds only. Shipment estimates are proxies; 2024 and H1 2026 allowances are explicitly modeled.

Opening scenarios: 0 / 0 / 0. H1 2026 baseline daily rate scenarios: 1.1 / 3.6 / 8.9.

Reported sample: Not established. A disjoint reported sample at the latest historical cutoff; consult dated observations. Unknown does not mean zero.

  • General-purpose bipeds only. Shipment estimates are proxies; 2024 and H1 2026 allowances are explicitly modeled.
  • All growth, delays, capacity paths, utilization, yield, component and demand factors are explicit editorial assumptions, informed by the linked disclosures. Capacity2030 is a scenario ceiling, not installed capacity. During ramp delays, baseline output remains subject to the same execution and demand ceiling.
  • Historical output is spread uniformly within each dated period solely for interpolation. Digit 2020 is split at the dated Ford delivery to respect that observed minimum. Forecast output is constant inside each quarter; it changes at quarter boundaries.
Fourier≈1,1662.4

General-purpose GR/N bipedal platforms; rehabilitation devices excluded.

Opening balance: Pre-2020 opening balance is an explicit research-fleet scenario. It is retained cumulatively; retirement does not undo production.

Historical reconstruction: GR-series bipeds only; rehabilitation devices excluded. Early cohorts and inventory are weakly evidenced reconstruction allowances.

Opening scenarios: 0 / 0 / 0. H1 2026 baseline daily rate scenarios: 0.8 / 2.4 / 5.7.

Reported sample: Not established. A disjoint reported sample at the latest historical cutoff; consult dated observations. Unknown does not mean zero.

  • GR-series bipeds only; rehabilitation devices excluded. Early cohorts and inventory are weakly evidenced reconstruction allowances.
  • All growth, delays, capacity paths, utilization, yield, component and demand factors are explicit editorial assumptions, informed by the linked disclosures. Capacity2030 is a scenario ceiling, not installed capacity. During ramp delays, baseline output remains subject to the same execution and demand ceiling.
  • Historical output is spread uniformly within each dated period solely for interpolation. Digit 2020 is split at the dated Ford delivery to respect that observed minimum. Forecast output is constant inside each quarter; it changes at quarter boundaries.
Agility Robotics≈5931.0

Digit and predecessor research bipeds; internal fleets included.

Opening balance: Pre-2020 opening balance is an explicit research-fleet scenario. It is retained cumulatively; retirement does not undo production.

Historical reconstruction: Only complete Digits enter this row; leg-only Cassie robots excluded. Ford's two deliveries are one observation. Remaining early production is an uncertain research/pilot allowance.

Opening scenarios: 1 / 8 / 30. H1 2026 baseline daily rate scenarios: 0.4 / 1.0 / 2.5.

Reported sample: 2+. A disjoint reported sample at the latest historical cutoff; consult dated observations. Unknown does not mean zero.

  • Only complete Digits enter this row; leg-only Cassie robots excluded. Ford's two deliveries are one observation. Remaining early production is an uncertain research/pilot allowance.
  • All growth, delays, capacity paths, utilization, yield, component and demand factors are explicit editorial assumptions, informed by the linked disclosures. Capacity2030 is a scenario ceiling, not installed capacity. During ramp delays, baseline output remains subject to the same execution and demand ceiling.
  • Historical output is spread uniformly within each dated period solely for interpolation. Digit 2020 is split at the dated Ford delivery to respect that observed minimum. Forecast output is constant inside each quarter; it changes at quarter boundaries.
Tesla≈6611.7

Optimus bipedal prototypes and internal fleets.

Opening balance: Pre-2020 opening balance is an explicit research-fleet scenario. It is retained cumulatively; retirement does not undo production.

Historical reconstruction: Actual internal fleet totals are not public. These are wide editorial prototype/pilot scenarios, not a claim that management's targets were achieved or missed.

Opening scenarios: 0 / 0 / 0. H1 2026 baseline daily rate scenarios: 0.3 / 1.7 / 10.7.

Reported sample: Not established. A disjoint reported sample at the latest historical cutoff; consult dated observations. Unknown does not mean zero.

  • Actual internal fleet totals are not public. These are wide editorial prototype/pilot scenarios, not a claim that management's targets were achieved or missed.
  • All growth, delays, capacity paths, utilization, yield, component and demand factors are explicit editorial assumptions, informed by the linked disclosures. Capacity2030 is a scenario ceiling, not installed capacity. During ramp delays, baseline output remains subject to the same execution and demand ceiling.
  • Historical output is spread uniformly within each dated period solely for interpolation. Digit 2020 is split at the dated Ford delivery to respect that observed minimum. Forecast output is constant inside each quarter; it changes at quarter boundaries.
Boston Dynamics / Atlas≈1020.2

Complete hydraulic and electric Atlas platforms.

Opening balance: Pre-2020 opening balance is an explicit research-fleet scenario. It is retained cumulatively; retirement does not undo production.

Historical reconstruction: Hydraulic and electric Atlas are distinct physical cohorts. Seven DARPA platforms form an old sample floor; later prototype and product cohorts are assumptions.

Opening scenarios: 7 / 20 / 60. H1 2026 baseline daily rate scenarios: 0.0 / 0.2 / 0.7.

Reported sample: 7+. A disjoint reported sample at the latest historical cutoff; consult dated observations. Unknown does not mean zero.

  • Hydraulic and electric Atlas are distinct physical cohorts. Seven DARPA platforms form an old sample floor; later prototype and product cohorts are assumptions.
  • All growth, delays, capacity paths, utilization, yield, component and demand factors are explicit editorial assumptions, informed by the linked disclosures. Capacity2030 is a scenario ceiling, not installed capacity. During ramp delays, baseline output remains subject to the same execution and demand ceiling.
  • Historical output is spread uniformly within each dated period solely for interpolation. Digit 2020 is split at the dated Ford delivery to respect that observed minimum. Forecast output is constant inside each quarter; it changes at quarter boundaries.
Legacy research programs≈1,1030.5

Honda, PAL, HUBO/HRP and other institutional bipeds; excludes all other rows.

Opening balance: Pre-2020 opening balance is an explicit research-fleet scenario. It is retained cumulatively; retirement does not undo production.

Historical reconstruction: Disjoint legacy/research allowance for Honda, PAL, HUBO, HRP and comparable institutional bipeds, excluding every named maker. Program evidence supports existence, not these quantities. All quantities are editorial scenarios.

Opening scenarios: 100 / 500 / 2,000. H1 2026 baseline daily rate scenarios: 0.1 / 0.5 / 1.7.

Reported sample: 1+. A disjoint reported sample at the latest historical cutoff; consult dated observations. Unknown does not mean zero.

  • Disjoint legacy/research allowance for Honda, PAL, HUBO, HRP and comparable institutional bipeds, excluding every named maker. Program evidence supports existence, not these quantities. All quantities are editorial scenarios.
  • All growth, delays, capacity paths, utilization, yield, component and demand factors are explicit editorial assumptions, informed by the linked disclosures. Capacity2030 is a scenario ceiling, not installed capacity. During ramp delays, baseline output remains subject to the same execution and demand ceiling.
  • Historical output is spread uniformly within each dated period solely for interpolation. Digit 2020 is split at the dated Ford delivery to respect that observed minimum. Forecast output is constant inside each quarter; it changes at quarter boundaries.
Other manufacturers≈4,4469.6

All other general-purpose biped makers, including 1X, Apptronik, Boston Dynamics, Noetix and newer research fleets; excludes every named row above.

Opening balance: Pre-2020 opening balance is an explicit research-fleet scenario. It is retained cumulatively; retirement does not undo production.

Historical reconstruction: Disjoint emerging-maker cohort: Apptronik, 1X bipeds, newer Chinese, European, Indian and other programs. Excludes the named makers and legacy research row. EVE and other wheeled products are excluded. Missing coverage is modeled, never an invented reported total.

Opening scenarios: 0 / 50 / 300. H1 2026 baseline daily rate scenarios: 3.3 / 9.6 / 25.4.

Reported sample: Not established. A disjoint reported sample at the latest historical cutoff; consult dated observations. Unknown does not mean zero.

  • Disjoint emerging-maker cohort: Apptronik, 1X bipeds, newer Chinese, European, Indian and other programs. Excludes the named makers and legacy research row. EVE and other wheeled products are excluded. Missing coverage is modeled, never an invented reported total.
  • All growth, delays, capacity paths, utilization, yield, component and demand factors are explicit editorial assumptions, informed by the linked disclosures. Capacity2030 is a scenario ceiling, not installed capacity. During ramp delays, baseline output remains subject to the same execution and demand ceiling.
  • Historical output is spread uniformly within each dated period solely for interpolation. Digit 2020 is split at the dated Ford delivery to respect that observed minimum. Forecast output is constant inside each quarter; it changes at quarter boundaries.
Original observations and exclusions

These source observations retain their original measures. They are not an additive list.

Unitree · >6,500 · Calendar 2025

production · bipedal · Historical production floor. Not added to shipments of the same robots.

Observation date 2025-12-31 · reviewed with model 2026-09-05.

Unitree Robotics · published 2026-01-22 ↗

Unitree · >5,500 · Calendar 2025

shipments · bipedal · Can be combined with H1 2026 deliveries because the reporting periods are disjoint; production and inventory stay separate.

Observation date 2025-12-31 · reviewed with model 2026-09-05.

Unitree Robotics · published 2026-01-22 ↗

Unitree · >7,000 · H1 2026

shipments · bipedal · Delivery proxy and cumulative-build floor, not measured production during H1.

Observation date 2026-06-30 · reviewed with model 2026-09-05.

Counterpoint Research · published 2026-08-20 ↗

AGIBOT · 1,846 · Cumulative X-series

cumulative production · bipedal · Directly identified biped family; included in the reported sample floor.

Observation date 2025-12-08 · reviewed with model 2026-09-05.

AGIBOT · published 2025-12-08 ↗

AGIBOT · 10,000 · Cumulative mixed portfolio

cumulative production · mixed · Used only with the later milestone to derive a mixed-output interval.

Observation date 2026-03-30 · reviewed with model 2026-09-05.

AGIBOT · published 2026-03-30 ↗

AGIBOT · 15,000 · Cumulative mixed portfolio

cumulative production · mixed · Apply a disclosed model-specific biped-share assumption; never count all 15,000 as bipeds.

Observation date 2026-06-28 · reviewed with model 2026-09-05.

AGIBOT · published 2026-06-28 ↗

Figure · >350 · Cumulative Figure 03

cumulative production · bipedal · Direct completed-robot floor; extrapolation is modeled separately.

Observation date 2026-04-29 · reviewed with model 2026-09-05.

Figure · published 2026-04-29 ↗

UBTECH · 1,079 · Calendar 2025

sales · mixed · Sales proxy under the company definition; unknown biped mix prevents a direct biped floor.

Observation date 2025-12-31 · reviewed with model 2026-09-05.

UBTECH · published 2026-07-13 ↗

Leju Robotics · 650 · H1 2026

shipments · mixed · Model scope adjustment; not automatically treated as biped production.

Observation date 2026-06-30 · reviewed with model 2026-09-05.

Counterpoint Research · published 2026-08-20 ↗

Unitree · 9 · Calendar 2023

production · bipedal · Exact annual production from the March 2026 filing. Sales are separate; this annual cohort is included once.

Observation date 2023-12-31 · reviewed with model 2026-09-05.

Unitree · prospectus (Chinese) · published 2026-03-20 ↗

Unitree · 545 · Calendar 2024

production · bipedal · Exact annual production from the March 2026 filing. Sales are separate; this annual cohort is included once.

Observation date 2024-12-31 · reviewed with model 2026-09-05.

Unitree · prospectus (Chinese) · published 2026-03-20 ↗

Unitree · 3,701 · January–September 2025

production · bipedal · Contained in the later full-year production disclosure; never add both periods.

Observation date 2025-09-30 · reviewed with model 2026-09-05.

Unitree · prospectus (Chinese) · published 2026-03-20 ↗

Agility Robotics · 2 · First Ford delivery

shipments · bipedal · Ford's launch announcement and sustainability report describe the same two robots. Count once.

Observation date 2020-01-06 · reviewed with model 2026-09-05.

Ford · published 2020-01-06 ↗

Boston Dynamics · 7 · DARPA Atlas platforms

shipments · bipedal · Already in the pre-2020 opening balance. Not an additional 2020 shipment.

Observation date 2013-07-11 · reviewed with model 2026-09-05.

DARPA · published 2013-07-11 ↗

AGIBOT · 962 · Cumulative mixed portfolio

cumulative production · mixed · Mixed milestone used for the dated backtest. Included in later milestones, never summed.

Observation date 2024-12-15 · reviewed with model 2026-09-05.

China Mobile Robot Alliance · published 2024-12-22 ↗
  • Wheeled humanoids, quadrupeds, robotic arms and rehabilitation devices
  • Small dedicated educational/toy humanoids such as NAO/AELOS
  • Unbuilt orders and announced production capacity
  • Double counting shipments, customer sites or earlier cumulative milestones
Sources and their limitations
Clarification regarding 2025 sales data ↗

Unitree Robotics · 2026-01-22

2025 humanoid production exceeded 6,500; deliveries exceeded 5,500. Wheeled robots are explicitly excluded.

Both values are thresholds, not exact totals. Their ratio does not establish an inventory ratio.

5,000th robot: product-family breakdown ↗

AGIBOT · 2025-12-08

Cumulative output: A-series 1,742; X-series 1,846; G-series 1,412.

G-series is wheeled. A-series also has an A2-W variant; its share is not disclosed. Only X-series enters the direct biped floor.

10,000th robot production milestone ↗

AGIBOT · 2026-03-30

Cumulative mixed-portfolio production reached 10,000.

Includes wheeled robots; not a biped-only count.

15,000th robot production milestone ↗

AGIBOT · 2026-06-28

Cumulative mixed-portfolio production reached 15,000; the milestone robot was a G2.

The 5,000 additions over 90 days measure mixed output. The biped share after December is undisclosed.

H1 2026 humanoid shipments ↗

Counterpoint Research · 2026-08-20

H1 shipments: Unitree >7,000; UBTECH around 1,000; Leju 650. Global total >22,000 includes wheeled models.

Shipments do not directly measure production. The page says August 19; its body dateline says August 20.

Ramping Figure 03 production ↗

Figure · 2026-04-29

Over 350 Figure 03 robots delivered; a one-robot-per-hour cycle demonstrated.

A demonstrated cycle is not 24/7 realized output. Older Figure generations and subsequent output are not quantified here.

UBTECH and Hitachi partnership; 2025 sales disclosure ↗

UBTECH · 2026-07-13

2025 full-sized humanoid sales totaled 1,079 under the company definition.

Sales, rather than production; the statement does not establish an exclusively bipedal product mix.

General-purpose embodied intelligent robots, 2026 · table 1, page 7 ↗

Omdia · 2026-01

Analyst estimates of manufacturer shipments in 2024 and 2025 provide historical scale for smaller manufacturers.

Mixed coverage and estimates, not audited builds. Its Unitree 2025 estimate is superseded by Unitree’s later disclosure. Hosted by AGIBOT; table visually checked.

Q2 2026 update ↗

Tesla / SEC · 2026-07-22

Describes the Optimus manufacturing ramp and planned line.

No current robot output total is established; design capacity is excluded from the count.

Humanoid production in 2025 ↗

Interact Analysis · 2026-06-11

Global production exceeded 20,000 in 2025 under the publisher’s coverage.

Used as context only. It is neither added to manufacturer rows nor silently treated as biped-only.

IPO application, production table p.134 ↗

Unitree · prospectus (Chinese) · 2026-03-20

The company reports 9 humanoids produced in 2023, 545 in 2024 and 3,701 in January–September 2025; sales were 5, 410 and 3,551 respectively.

Company filing reproduced by a financial-document host. This dated application is not the final prospectus; later full-year disclosure replaces the partial 2025 period. Production and revenue-recognized sales have different scopes.

First two commercial Digits ↗

Ford · 2020-01-06

Ford was the first customer for two commercial Digit robots in 2020.

A customer delivery minimum, not total Agility production. The old newsroom URL may redirect; Ford's 2020 sustainability report also documents the acquisition.

Creating tomorrow together · sustainability report ↗

Ford · 2020

Ford describes acquiring two upright Digit robots for warehousing and delivery research.

Same two robots as the launch announcement; never add these records.

ASIMO announcement ↗

Honda (Japanese) · 2000-11-20

Documents a complete research humanoid program before the chart starts.

Establishes existence, not an all-time fleet count. Opening-balance quantities are editorial assumptions.

TALOS introduction ↗

PAL Robotics · 2016-10-04

European full-size research humanoid program; first platform intended for LAAS-CNRS.

Announcement and intended delivery do not establish yearly production totals.

Rainbow Robotics and the HUBO program ↗

KAIST (Korean) · 2021-03-12

KAIST identifies the founders of Rainbow Robotics with its bipedal HUBO program.

Qualitative program evidence; no robot quantity is supplied. Quadrupeds and robot arms are excluded.

Atlas robot debut ↗

DARPA · 2013-07-11

Seven Atlas platforms were provided to qualifying DARPA Robotics Challenge teams.

A historical sample, not Boston Dynamics' total production. Subsequent reuse does not create additional robots.

AGIBOT approaches 1,000 mixed robots ↗

China Mobile Robot Alliance · 2024-12-22

Reports 962 cumulative robots as of December 15, 2024, covering both bipedal and wheeled models.

Mixed-form total cannot enter the bipedal floor. The article's anticipated 200 biped deliveries are a target, not a completed delivery count.

Q1 2025 all-hands recording ↗

Tesla · 2025-03-20

Original recording associated with Musk's 2025 and 2026 production ambitions.

Video source reference; numerical statements were cross-checked against contemporary reporting. Targets do not establish achieved output.

All-hands recap and replay ↗

Not a Tesla App · 2025-03-21

Contemporary recap reports ambitions of 5,000 robots in 2025 and 50,000 in 2026.

Secondary reporting of management ambitions; actual annual output remains unverified.

Q1 2025 financial results webcast ↗

Tesla · 2025-04-22

Original webcast for Musk's longer-term Optimus production discussion.

The linked contemporaneous report provides the transcribed numerical statement; this is not achieved output.

Optimus ramp and component constraints ↗

The Register · 2025-04-23

Reports Musk's expectation of one million Optimus units annually by 2030, potentially 2029, while discussing component constraints.

An annual-output ambition, not cumulative robots built; no precise ramp probability can be inferred.

CES 2026 robotics strategy ↗

Hyundai Motor Group · 2026-01-05

Targets a production system capable of 30,000 robot units annually by 2028 and phased Atlas deployment.

A future production-system target; the release's robot scope and timing do not prove 30,000 current Atlas units.

BotQ manufacturing plan ↗

Figure · 2025-03-15

Describes a 12,000-unit annual production-line design and supply-chain capability for 100,000 robots over four years.

Capacity and supply-chain capability are separate from actual completed production or contracted demand.

Apollo introduction ↗

Apptronik · 2023-08-23

Documents the Apollo program's public introduction in 2023.

No production total disclosed; represented within the disjoint emerging-maker scenario.

Humanoid revenue outlook through 2035 ↗

Interact Analysis · 2026-05-21

Analyst outlook distinguishes future demand from limited present commercial workforce adoption.

Market shipments and applications differ from all-time bipedal production. Used as a constraint/context check, not an added count.

Dated 2024 humanoid shipment forecast ↗

Omdia · 2024-07-25

A historical forecast put 2030 annual humanoid shipments at 38,000.

A dated forecast with an earlier market definition; not a current estimate or a comparable bipedal-production outcome.

China scales humanoids; demand remains a constraint ↗

Associated Press · 2026-06

Reporting examines Chinese manufacturing scale, customer demand and differing global forecasts.

Not an additive production ledger. Quantities attributed to analysts retain their shipment definitions.

Q4 2024 results webcast ↗

Tesla · 2025-01-29

Original webcast associated with the early 2025 Optimus internal plan.

Numerical statement cross-checked in contemporary reporting; an ambition, not a completed output disclosure.

Musk's internal 2025 Optimus plan ↗

Electrek · 2025-01-31

Reports a 10,000-unit internal 2025 plan, with Musk expecting several thousand rather than full achievement.

Contemporaneous reporting of a management target. Outcome is not verified by this article.

Version 2026-09-05-draft-2 · draft for review. Download the complete model JSON

Model revision · 2026-09-05 · draft

What changed in the estimate?

At the same review time, the estimate changed by +2,837 as historical coverage and production assumptions were revised.

Why it changed · compare the preserved versions

Previous counter · at the review date

≈45,037

2026-09-05-draft-1 · constant 122.2/day.

Rebuilt model · at the same instant

≈47,875

Manufacturer ledger, bipedal scope, 123.4 modeled additions/day.

The difference is a change in assumptions and coverage, not robots disappearing. The earlier preview’s H1 shipment figure measured a different quantity. That evidence remains available in its original edition.

  • Reconstructed annual cohorts and pre-2020 opening balance.
  • Unitree 2023/2024 production replaces shipment proxies.
  • Quarterly constrained ramps replace indefinite constant production.
  • Earlier snapshot and its calculation remain preserved.
Open the preserved counter snapshot ↗

The weekly briefing

Follow what changes.

One source-linked update each week: production disclosures, factory developments and changes to the estimate.

Read a sample briefing

Sample · September 5, 2026 · draft

A longer view of humanoid production

The draft model now reconstructs production from 2020 and includes quarterly scenarios through 2030. Early research fleets remain incompletely documented.

Company ambitions are shown separately from the forecast. Capacity announcements establish potential, rather than completed robots.

Inspect the outlook and original sources ↗

Get one concise, source-linked industry update each week.

Your email is used for the briefing. Privacy details.